Viewing 2 posts - 1 through 2 (of 2 total) Author Posts July 24, 2019 at 7:07 pm #1121694 MasterFloParticipant https://kriesi.at/themes/enfold-consulting/ if you check the “4 Easy Steps to Sccess” Section on mobile view, the order of Picture and text is changing. Is there a way to make him order it in a fix structure first Text and than the picture? Thx for your answer :) July 25, 2019 at 10:42 pm #1121993 BasilisInactive Moderator Hey MasterFlo, Yes you can re-arrange those on the mobile view, by changing the float with a media query. Let us know if that would work for you Best regards, Basilis Author Posts Viewing 2 posts - 1 through 2 (of 2 total) You must be logged in to reply to this topic. Log In Username: Password: Keep me signed in Log In